Current Inventory

New and Used Boiler Equipment

WARE stocks new and remanufactured boiler equipment. WARE's new boiler equipment is made by the top manufacturers in the industry for both industrial and commercial applications. Our high quality remanufactured boiler equipment is guaranteed to give you reliable performance with a new boiler warranty. Remanufactured boiler equipment can be a great option when a budget is limited or a long lead time just is not possible.

 

Victory Energy
Victory Energy
  • 50 HP |
  • Gas/#2
  • New |
  • SB-283
Victory Energy
Victory Energy
  • 50 HP |
  • Gas/#2
  • New |
  • SB-285
Victory Energy
Victory Energy
  • 70 HP |
  • Gas/#2
  • New |
  • SB-271
Victory Energy
Victory Energy
  • 70 HP |
  • Gas/#2
  • New |
  • SB-272
Victory Energy
Victory Energy
  • 70 HP |
  • Gas/#2 Low Nox
  • New |
  • SSB-64
Victory Energy
Victory Energy
  • 100 HP |
  • Gas/#2 Low Nox
  • New |
  • SSB-60
Victory Energy
Victory Energy
  • 150 HP |
  • Gas/#2 Low Nox
  • New |
  • SSB-66
Victory Energy
Victory Energy
  • 150 HP |
  • Gas/#2
  • New |
  • SB-280
Victory Energy
Victory Energy
  • 150 HP |
  • Gas/#2
  • New |
  • SB-289
Victory Energy
Victory Energy
  • 250 HP |
  • Gas/#2 Low Nox
  • New |
  • SSB-78
Victory Energy
Victory Energy
  • 250 HP |
  • Gas/#2 Low Nox
  • New |
  • SSB-70
Victory Energy
Victory Energy
  • 400 HP |
  • Gas/#2 Low Nox
  • New |
  • SSB-74

Zussman Village

Zussman Village – Urban Combat Training Facility Ft. Knox, Ky

See Our Work

Eastern Kentucky University Retube Job is a Success

The boiler, located on EKU’s campus in Richmond, Kentucky, provides heat to multiple buildings on campus, including dormitories.

See Our Work

Amelin

The customer needed a system that would produce 20 tons of steam per hour (44,000 lbs) and could be built in the U.S., disassembled, then shipped to Russia and reassembled on-site.

See Our Work

Heaven Hill Distillery

78,000 PPH Watertube Boiler Installation (in under 2 weeks)

See Our Work

Hurricane Sandy + New York City Housing Authority

WARE was able to supply all the steam units requested (25), as well as the installation and maintenance required for the units.

See Our Work

Antonov - Irving Oil

Prepare 2-75,000 pph boilers for emergency shipment, by air, to Halifax Nova Scotia.

See Our Work

Appleton

Three 75,000 pph boilers with economizers, stacks, support steel

See Our Work

Bell Corp

Two 60,000 pph and (2) Mobile 80,000 pph D.A. units

See Our Work

Chevron Nigeria

60,000 pph boiler, Mobile Deaerator System, 20,000 gallon fuel oil tank

See Our Work

Four Roses

The project was for a complete inside the walls Design, Engineer and Installation. Including start-up, commissioning and training.

See Our Work

Owensboro Grain

WARE was responsible for the Design, Engineering, Procurement, and construction of the project from the foundation to start-up.

See Our Work

Premier Energy

Rental of Three 75,000 pph boilers with economizers

See Our Work

Rona

Two 70,000 lb/hr Water Tube Boilers -

See Our Work

Confirm Your Account

Please select your preferred confirmation.

A verification code has been sent to . This code will be valid for minutes after .

A verification code has been sent to . This code will be valid for minutes after .